Overspeed test is one of the important processes before the commission of a steam-power plant. 超速试验是火力发电机组投入运行前的重要工艺环节之一。
The Common Methods for the Optimal Land Utilization in Steam-power Plant 火力发电厂节约用地的常用方法
Application of the Roof Grid Structure of the Main Workshop Buildings in the Steam-power Plant 火力发电厂主厂房屋面网架的应用
Combined with construction example the calculation method is introduced for steam drum hoisting in steam-power plant and discussed from cross section design of hanging beam, hoisting technology and other aspects. In addition the matters needing attention in hoisting operation are pointed out. 结合工程实例,介绍了火力发电厂汽包吊装计算方法,从吊装梁截面设计、汽包吊装工艺等方面进行了论述,提出了汽包吊装时的注意事项。